Fire Station #3 Lead Engineer : David Krugler (763) 862 - 8000
4/18/24 Ebert tested the backup generator for the facility. 4/17/24 Ebert tested the filling station and ability to provide water for fire tanker trucks. 4/10/24 Ebert Construction requested inspection for providing the City Substantial Completion authorization. 1/15/24 Paint stairs and polished concrete begins. 12/28/23 Tile is complete. 12/15/23 Painting, tile, plumbing, HVAC, electrical in progress. Insulation complete. 11/30/23 Drywall, plumbing, ductwork, electrical. Soffits and well installation in progress. Gas service installed and complete. 10/25/23 Brick, trash enclosure, septic system, site concrete complete. 10/12/23 Parking lot curb complete. 9/28/23 Interior concrete and framing complete. Begin office plumbing, ductwork, electrical and final parking lot grading. 9/18/23 Interior framing begins. 9/15/23 Brick installation to begin. 9/14/23 Below grade plumbing and office concrete complete. 8/21/23 Well drillers to begin installing well. 8/17/23 Trusses and roof sheathing complete. Storm sewer and below grade plumbing to begin. 7/24/23 Framing will begin. 7/20/23 Site removals complete and block installation in progress. Utilities to follow when completed. 4/17/23 The City Council awarded the project to Ebert Construction.
The above information will be maintained as up to date as possible.